ABS delivered Electrical Design and Fit-Out at NBC Borehamwood Studios, including CIBSE-compliant emergency lighting, presence/daylight controls and 3-phase supply throughout, completed on time in a live, secure environment.

01.

Avanta (Main contractor: CBRE)

About The Project

Electrical excellence in a live production environment

A Bright Solution was engaged by Avanta, with CBRE as main contractor, to deliver the full electrical design and fit-out for active studio spaces at NBC Borehamwood. The brief was clear: upgrade lighting and power infrastructure to the highest performance and safety standards without interrupting filming schedules. Working within a live, security-controlled environment demanded meticulous coordination, silent efficiency, and flawless documentation. Every task planned to protect production continuity while achieving complete technical compliance.

The project combined premium Thorlux lighting systems, intelligent controls, and fully certified emergency lighting compliant with CIBSE and BS 7671 regulations. Designed for long-term maintainability, the installation delivers dependable power, lighting, and life-safety functionality tailored for high-footfall media spaces.

Integrated design & precise coordination

Before installation, ABS carried out a detailed design review to ensure the new electrical infrastructure aligned with existing containment, ceiling grids, and studio layouts. This included load analysis, distribution board rationalisation, and lighting control zoning to support multiple production modes.

Close collaboration with Thorlux engineers enabled the integration of presence detection and daylight-harvesting controls, ensuring energy efficiency and optimal light balance during both recording and standby periods. Our drawings and schematics documented every containment route, circuit reference, and control interface to streamline installation and future maintenance.

Coordination with CBRE’s mechanical and finishes teams was continuous. We scheduled penetrations, bracket positions, and containment sequencing to avoid clashes with HVAC ducts, acoustic panels, and ceiling fixtures. The result was a clean, fully coordinated installation ready for commissioning without rework.

Programme & live-site delivery

The works were delivered under a three-week compressed programme, executed primarily during evening and off-peak hours. Each shift was governed by pre-approved RAMS, security permits, and method statements validated by site management.

Our electricians operated under strict noise and light-spill restrictions to maintain uninterrupted filming nearby. Cable runs, terminations, and testing were completed in phases, allowing partial energisation while other trades progressed. Daily coordination meetings kept sequencing tight and documentation aligned across teams.

Every component, from distribution boards to emergency lighting circuits, was inspected, tested, and signed off before handover with certificates compiled into the final O&M pack.

Outcome & project impact

The project was completed on time and to specification, providing NBC Borehamwood with a resilient, compliant electrical system that enhances both safety and usability. Key achievements include:

  • New 3-phase distribution board supplying lift and studio ancillary loads
  • Emergency lighting fully compliant with CIBSE LG12 and BS 5266-1 guidance
  • Presence and daylight control systems for energy-efficient operation
  • Containment and small-power upgrades installed with precision and labelled for easy maintenance
  • Full certification and O&M documentation handed over to the client team

The upgraded infrastructure now delivers improved reliability, reduced energy consumption, and simpler ongoing maintenance — ensuring the studios remain operationally efficient for future productions.

Why it matters

Electrical works in live environments require exceptional control and accountability. By combining disciplined design, planned night-time delivery, and transparent testing, A Bright Solution proved that complex electrical upgrades can be completed safely and silently in active media facilities. Our integrated approach — design to handover under one lead — eliminates interface risks and ensures programme certainty, even in the most sensitive commercial settings.

Linked Services

If you’re preparing a studio, warehouse, or commercial fit-out, explore our Electrical Services for compliant design, installation, and commissioning solutions.

Our gallery

No items found.

Get Started

Let's discuss Your Project

Send Tender Pack
A Bright Solution installed a stage for a film set in a London warehouse

Our work

More Case Studies

MOD Training Facilities: Sandhurst & UK Multi-Site

ABS delivered multi-site MOD training facilities with full electrical infrastructure, DBs, small power, heating controls and soft-start systems. Completed on time under security-cleared conditions.

NBC Borehamwood Studios

ABS delivered Electrical Design and Fit-Out at NBC Borehamwood Studios, including CIBSE-compliant emergency lighting, presence/daylight controls and 3-phase supply throughout, completed on time in a live, secure environment.